The Karot Hydropower Project is an under construction run-of-river concrete-core rockfill gravity dam in Pakistan with an installed capacity of 720 MW.
The Karot Hydropower Station in Pakistan is the first investment project of the Silk Road Fund, is part of the much larger CPEC ChinaPakistan Economic Corridor, and is expected to be completed in 2020.
Status: Under construction
Construction began: January 2016
Construction cost: $1.42 billion
Commission date: Apr 2021
Turbines: 4 x 190 MW Francis-type
Installed capacity : 720 MW

Reservoir Total capacity: 164.5 million
Maximum length: 27 km (17 mi)
Normal elevation: 461 m (1,512 ft)

Karot Hydropower Project